Peter King went back into the PSL so that we could try to lock the IMC for some work in HAM6 this evening. While Peter was in the enclosure, the IMC was locked and the alignment was decent, however as Peter was leaving it looks like something misaligned in yaw which is not in the same gouy phase as the PZT, so we can't re-aling it without going back into the PSL. Since I'm not sure which irises Peter and the PMC crew were using, we are not going to try to align it tonight. If we can lock the IMC tomorrow that will help us to finish of HAM6 work.
I've left the alignment sliders as they were last night, this is the alingment that Craig had used to lock the IMC between the EOM and PMC swap. If the irises were set after the EOM swap then these might be a good reference for recovering the IMC alignment.