Reports until 16:08, Wednesday 18 April 2018
H1 AOS
edmond.merilh@LIGO.ORG - posted 16:08, Wednesday 18 April 2018 (41514)
Shift Summary - Day

TITLE: 04/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

15:22 Untripped OM and SEI WDs in HAM6

15:28 Robert out to LVEA for equipment

15:46 Karen to Y arm stations for cleaning

15:48 APS on site

15:53 TvO out to LVEA to retrieve a laptop

16:00 Jason out to PSL

16:20 Jeff B out to LVEA

16:50 N and Terry out to HAM6

16:51 Verbal Alarms restarted_ crashed

16:53 Hugh out to LVEA to do property inventory

17:19 Marc to CER mez to check HV squeezer HV supply

17:24 Mark and Tyler back from EX

17:38 Jeff B back

17:42 Vac team out to MY

18:01 Hugh back

18:33 Marc out to floor to replace squeezer PZT supply

18:35 Hugh to EX for inventory

18:20 Dave B at EX for a SUSAUX computer reboot

18:50 Dave back

19:26 Marc back

19:28 Hugh back

19:49 Rick, Peter, and Jason out of the PSL

20:33 Ken out to the LVEA to breech the outside door for an electrical installation

20:35 Jonathan to restart FW0

20:37 Travis to EX to take pictures of weld mirrors

20:43 Ken back

20:44 Marc out to LVEA

20:45 Georgia, Craig, and Niko to EX to work in-chamber - EFM

20:49 N out to HAM6 table area

20:50 Hugh out to HAM6

20:55 Travis back

20:56 Corey out to LVEA- installing panel on squeezer table

20:57 Dave to MX to restart PEMMX

21:04 Cheryl out to the optics lab

21:23 Cheryl back

21:36 Corey back

21:39 Hugh back

21:41 Dave back to MX to try again

21:42 Tyler ad Mark out to LVEA - large equipment access area

21:48 N back

22:00 Site Weekly