Displaying report 1-1 of 1.
Reports until 15:58, Thursday 19 April 2018
H1 General
edmond.merilh@LIGO.ORG - posted 15:58, Thursday 19 April 2018 (41539)
Shift Summary - Day

TITLE: 04/19 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

LOG:

15:00 Christina noted on the EX camera, cleaning.

15:30 Sheila and Terry headed to Ham6

16:00 APS on site

16:24 Jeff K tour out to LVEA

16:39 Jeff B out to LVEA and then to Ends

16:45 Fil into CER

16:57 Access tech to EX

17:07 Chandra to EY with guests

17:12 Terry back

17:20 Peter and Fil to EX to do ALS interlock work

17:38 Gerardo out to LVEA - looking for viewport protector

17:41 Karen leaving EY

17:59 Fil and Peter back

18:14 Fil out to LVEA - PSL closet for access system

18:24 Jeff B back

18:34 Gerardo to EY

18:47 Sheila called to say the Squeezer

18:55 Tour group into CR

19:40 HANFORD EMERGENCY 'TAKE COVER' DRILL MESSAGE received

19:43 Peter out to PSL enclosure

20:07 DRILL MESSAGE TERMINATED

20:35 Visitor for Chandra on site

20:48 Jaime doing some Guardian re-boots

20:50 Jason ad Rick out tp PSL enclosure

20:51 Corey to end stations for inventory

20:52 Sheila out to HAM6

21:12 Corey heading back

21:20 Betsy ad Travis heading out to EX

21:25 Chandra,et al, back out to EY

21:33 Gerardo out to HAM6

21:35 Cheryl out to PSL encosure

21:42 Gerardo back

21:48 Fil out to LVEA to install network switch in PSL closet

21:54 Georgia and Niko out to EX

22:19 Sheila and Terry going out to HAM6

22:22 Niko and Georgia back

22:39 Travis and Betsy back

 

Displaying report 1-1 of 1.