Prior to shift: Verbal alarms is crashed Jamie working on guardian 14:47 UTC Jeff B. to end X to reset dust monitor 15:28 UTC Jeff B. back from end X 15:37 UTC Let Advanced Protection Services (APS) through gate 15:48 UTC Peter to PSL enclosure 15:59 UTC Let visitor through gate to see Chandra 16:04 UTC Let Advanced Protection Services (APS) through gate 16:38 UTC Robert to end X to change a setting on electric field injection 16:43 UTC Sheila and Nutsinee to HAM6 to run a beam scan on the squeezer beam 17:05 UTC Robert back from end X 17:12 UTC Greg G. to LVEA 17:24 UTC Robert and Georgia to end X, inchamber work on EFI, check cyropump baffles 17:30 UTC Ed to optics lab, LVEA for property inventory 17:37 UTC Gerardo to LVEA to retrieve power supply to take to end Y 18:03 UTC Peter done in PSL enclosure 18:55 UTC Terry to HAM5 to give equipment to Sheila 18:55 UTC Gerardo to end Y to check on status of HV NEG pump bake 18:59 UTC Robert and Georgia back from end X 19:06 UTC Ken to end X to work on the ceiling above the outside door 20:02 UTC Ken done at end X 20:06 UTC Marc and Elizabeth to LVEA to look for equipment for property inventory 20:14 UTC Marc and Elizabeth done 20:14 UTC Let visitor through gate to see Chandra 20:24 UTC Ed and Elizabeth to end Y for property inventory 20:49 UTC Ed and Elizabeth back from end Y 20:55 UTC Nutsinee back to HAM6 20:56 UTC Elizabeth to LVEA to look for coil of wires 20:58 UTC Corey and Hugh to HAM5 area to prep for vent next week 21:09 UTC Elizabeth back from the LVEA 21:09 UTC Sheila back to HAM6 22:25 UTC Hugh back 22:47 UTC Corey back