Reports until 16:14, Friday 20 April 2018
LHO General
patrick.thomas@LIGO.ORG - posted 16:14, Friday 20 April 2018 (41570)
Ops Shift Summary
Prior to shift:
Verbal alarms is crashed
Jamie working on guardian

14:47 UTC Jeff B. to end X to reset dust monitor
15:28 UTC Jeff B. back from end X
15:37 UTC Let Advanced Protection Services (APS) through gate
15:48 UTC Peter to PSL enclosure
15:59 UTC Let visitor through gate to see Chandra
16:04 UTC Let Advanced Protection Services (APS) through gate
16:38 UTC Robert to end X to change a setting on electric field injection
16:43 UTC Sheila and Nutsinee to HAM6 to run a beam scan on the squeezer beam
17:05 UTC Robert back from end X
17:12 UTC Greg G. to LVEA
17:24 UTC Robert and Georgia to end X, inchamber work on EFI, check cyropump baffles
17:30 UTC Ed to optics lab, LVEA for property inventory
17:37 UTC Gerardo to LVEA to retrieve power supply to take to end Y
18:03 UTC Peter done in PSL enclosure
18:55 UTC Terry to HAM5 to give equipment to Sheila
18:55 UTC Gerardo to end Y to check on status of HV NEG pump bake
18:59 UTC Robert and Georgia back from end X
19:06 UTC Ken to end X to work on the ceiling above the outside door
20:02 UTC Ken done at end X
20:06 UTC Marc and Elizabeth to LVEA to look for equipment for property inventory
20:14 UTC Marc and Elizabeth done
20:14 UTC Let visitor through gate to see Chandra
20:24 UTC Ed and Elizabeth to end Y for property inventory
20:49 UTC Ed and Elizabeth back from end Y
20:55 UTC Nutsinee back to HAM6
20:56 UTC Elizabeth to LVEA to look for coil of wires
20:58 UTC Corey and Hugh to HAM5 area to prep for vent next week
21:09 UTC Elizabeth back from the LVEA
21:09 UTC Sheila back to HAM6
22:25 UTC Hugh back
22:47 UTC Corey back