TITLE: 04/24 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Bootfest Happened. Also Squeezer work continues. All other activities below.
LOG:
- 14:29 Moving items into the Beer Garden (Tyler/Mark)
- 14:59-17:00 Access system work at carpenter shop (Ken)
- 15:39 HAM5 HEPI tripping investigations (hugh)
- 15:39 LN2 truck turned "right" (CP2?)
- 15:45-16:15 Recalibrate SR3 Heater from CER (T-Vo)
- 15:54 Starting HVAC fan lubrication at OSB/LVEA, out-bldgs Wed/Thurs (Bubba, Mark)
- 16:05 HAM6/SQZ table measurements this morning (Nutsinee)
- 16:27 Apollo here for HVAC work at LDAS Room today-tomorrow (Bubba)
- 16:27 Paradise water
- 16:00 - 17:00 SDF checks beginning in prep for big BOOT FEST!
- 16:44-18:52 EX filter change for HEPI pump (hugh)
- 16:45-17:01 Putting up VAC-related signs in lvea (kyle)
- 16:48 H1 PSL measurements (Peter)
- 17:01-18:15 Running fiber MSR-Closet (ken)
- 17:01-20:15 Bootfest begins! (dave)
- Noticed SEI Guardians all WHITE (unrelated?), TJ & Dave working on this.
- DAQ restart finished at 20:15.
- 18:15 Power work at woodshop (ken)
- 18:47 Beam profile work at HAM6 (sheila, thomas)
- 18:47 Measuring (3) chasis at EY (gerardo)
- Keita running endstation TMS measurements
- 19:53 Timing comparator upgrade (marc)
- 20:42 PSL work cont. (Peter & Jeff B)
- 21:22 LN2 truck for CP6 (MX, #79)
- 21:51 HAM4 Baffle search (TJ)
- 21:50 Turning down purge on HAM6 for OMC scan (thomas)---will turn back UP when they close up the chamber after their OMC scan measurements.
- 22:00 MY VAC check (chandra)
- 22:30 Work at the Vault (Marc, Ed)