Patrick, TiVo, Dave:
Patrick modified h1ecatc1plc1 to add remote controls of the MSR fiber polarizer (2017 SURF project). TiVo changed some SR3 TCS ring heater channel names.
I ran my update_beckhoff_daq_target_sdf_configuration script, which created the new monitor.req files for these system. On h1build I restarted the SDF for C1PLC[1,3]. For the new, not-initialized channels, I ACCEPTED and MONITORED them all. Subsystem leads should un-monitor as required.
C1PLC1 snap changes:
+H1:SYS-FIBER_POL_CORR_COMMAND_REQ 1 0.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_POL1 1 0.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_POL2 1 0.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_RATE1_REQ 1 1.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_RATE2_REQ 1 1.50000000000000000000e+01 1
+H1:SYS-FIBER_POL_CORR_STEP_SIZE 1 5.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_X1_POSITION_REQ_DEG 1 0.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_X2_POSITION_REQ_DEG 1 0.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_Y1_POSITION_REQ_DEG 1 0.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_Y2_POSITION_REQ_DEG 1 0.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_Z1_POSITION_REQ_DEG 1 0.00000000000000000000e+00 1
+H1:SYS-FIBER_POL_CORR_Z2_POSITION_REQ_DEG 1 0.00000000000000000000e+00 1
C1PLC3 snap changes:
-H1:AWC-SR3_HEATER_DRV_ISET_GAIN 1 2.23999999999999985789e+01 1
-H1:AWC-SR3_HEATER_DRV_ISET_OFFSET 1 0.00000000000000000000e+00 1
+H1:AWC-SR3_HEATER_DRV_VSET_GAIN 1 3.30000000000000015543e-01 1
+H1:AWC-SR3_HEATER_DRV_VSET_OFFSET 1 0.00000000000000000000e+00 1