Reports until 16:00, Wednesday 25 April 2018
H1 General
yannick.lecoeuche@LIGO.ORG - posted 16:00, Wednesday 25 April 2018 (41671)
Shift Summary - Day

TITLE: 04/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC

STATE of H1: Planned Engineering

INCOMING OPERATOR: None

LOG:

14:59 (7:59) Ken to various parts of CS -- Installing cameras

15:00 (8:00) Start of shift

16:00 (9:00) Sheila to HAM6 -- Split cover

16:01 (9:01) Hugh, Corey to LVEA -- Mark table location, lock HAM4 HEPI

16:05 (9:05) Chandra to MY

16:15 (9:15) Sheila back from HAM6

16:49 (9:49) Nutsinee to SQZ rack -- Plugging in cables

17:03 (10:03) Nutsinee back from SQZ rack

17:06 (10:06) Sheila to LVEA -- take lock off PSL light pipe

17:07 (10:07) Cheryl to LVEA

17:08 (10:08) Corey back from LVEA

17:08 (10:08) Hugh back from LVEA

17:10 (10:10) Sheila back from LVEA

17:15 (10:15) Cheryl back from LVEA

17:27 (10:27) Chandra back from MY

17:34 (10:34) Keita, Corey to EX -- TMSX work

17:40 (10:40) Peter to PSL enclosure

17:48 (10:48) Hugh to HAM4 -- finish lockup

17:59 (10:59) Sheila, TJ, TVo to HAM6 -- check SQZ/IFO beam alignments

18:20 (11:20) Hugh back from HAM4

18:37 (11:37) Rick to PSL enclosure

18:41 (11:41) Ken to LVEA

19:08 (12:08) Corey, Keita heading back from EX for lunch

19:20 (12:20) TJ, TVo,Sheila back from HAM6

20:09 (13:09) Peter, Rick out of PSL enclosure

20:10 (13:10) Keita, Corey to EX

20:20 (13:20) Ed to SQZ table -- Label connectors

20:48 (13:48) Sheila, TVo to HAM6 -- Take close-out photos

20:50 (13:50) Nutsinee to HAM6 -- assist Sheila and TVo

21:05 (14:05) Gerardo to HAM6

21:22 (14:22) Chandra to EY, MY

21:46 (14:46) TJ to Optics Lab

21:50 (14:50) Travis to EX -- Deliver BOSEMS

21:53 (14:53) TJ out of Optics Lab

22:00 (15:00) Gerardo back from LVEA

22:10 (15:10) Travis back from EX

22:19 (15:19) TVo, Sheila back from HAM6

22:32 (15:32) Nutsinee back from HAM6

22:35 (15:35) Corey, Keita back from EX

23:00 (16:00) End of shift