TITLE: 04/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
LOG:
14:59 (7:59) Ken to various parts of CS -- Installing cameras
15:00 (8:00) Start of shift
16:00 (9:00) Sheila to HAM6 -- Split cover
16:01 (9:01) Hugh, Corey to LVEA -- Mark table location, lock HAM4 HEPI
16:05 (9:05) Chandra to MY
16:15 (9:15) Sheila back from HAM6
16:49 (9:49) Nutsinee to SQZ rack -- Plugging in cables
17:03 (10:03) Nutsinee back from SQZ rack
17:06 (10:06) Sheila to LVEA -- take lock off PSL light pipe
17:07 (10:07) Cheryl to LVEA
17:08 (10:08) Corey back from LVEA
17:08 (10:08) Hugh back from LVEA
17:10 (10:10) Sheila back from LVEA
17:15 (10:15) Cheryl back from LVEA
17:27 (10:27) Chandra back from MY
17:34 (10:34) Keita, Corey to EX -- TMSX work
17:40 (10:40) Peter to PSL enclosure
17:48 (10:48) Hugh to HAM4 -- finish lockup
17:59 (10:59) Sheila, TJ, TVo to HAM6 -- check SQZ/IFO beam alignments
18:20 (11:20) Hugh back from HAM4
18:37 (11:37) Rick to PSL enclosure
18:41 (11:41) Ken to LVEA
19:08 (12:08) Corey, Keita heading back from EX for lunch
19:20 (12:20) TJ, TVo,Sheila back from HAM6
20:09 (13:09) Peter, Rick out of PSL enclosure
20:10 (13:10) Keita, Corey to EX
20:20 (13:20) Ed to SQZ table -- Label connectors
20:48 (13:48) Sheila, TVo to HAM6 -- Take close-out photos
20:50 (13:50) Nutsinee to HAM6 -- assist Sheila and TVo
21:05 (14:05) Gerardo to HAM6
21:22 (14:22) Chandra to EY, MY
21:46 (14:46) TJ to Optics Lab
21:50 (14:50) Travis to EX -- Deliver BOSEMS
21:53 (14:53) TJ out of Optics Lab
22:00 (15:00) Gerardo back from LVEA
22:10 (15:10) Travis back from EX
22:19 (15:19) TVo, Sheila back from HAM6
22:32 (15:32) Nutsinee back from HAM6
22:35 (15:35) Corey, Keita back from EX
23:00 (16:00) End of shift