Reports until 16:06, Thursday 26 April 2018
H1 AOS
edmond.merilh@LIGO.ORG - posted 16:06, Thursday 26 April 2018 (41682)
Shift Summary - Day

TITLE: 04/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

 

15:40 TJ out to HAM6

16:46 Kyle at EY

16:58 Tj back

17:28 Cheryl out to PSL enclosure -camera placements

17:39 Hugh and Corey out to lock ITMY HEPI

17:39 Gerardo out to HAM6

17:40 Marc to MY

17:57 Fil out to HAM6 - killing HV to PZT and Fast Shutter

18:00 Gerardo back

18:30 Hugh and Corey done locking ITMY and moving to ITMX

18:52 Fil out

19:12 Cheryl back

20:43 Corey transitioning LVEA to LASER safe

20:53 Sheila ou to HAM6

20:55 Cheryl out to PSL enclosure

20:56 Fil out to LVEA - ground loop checking with Keita

20:57 Main PSL shutter closed - light from IMC cameras went dark

21:03 Chandra out to MY

21:09 Keita out to HAM6

21:35 Corey back

22:45 Hugh back

23:00 Fil and Cheryl back

23:05 Marc still at vault in desert