kyle.ryan@LIGO.ORG - posted 18:06, Wednesday 15 December 2010 (417)
CP7 level alarm
Operator:  I confirmed while in manual control that the CP7 liquid transfer line is cold and will permit filling of CP7.  I expect CP7's level to increase and surpass the setpoint off 92% this evening.  Afterwhich CP7 should be under control of the PI loop and any alarms following this should be observed.  