Displaying report 1-1 of 1.
Reports until 16:04, Friday 04 May 2018
LHO General
patrick.thomas@LIGO.ORG - posted 16:04, Friday 04 May 2018 (41846)
Ops Shift Summary
15:04 UTC Peter done working by PSL racks
15:27 UTC Visitor through gate to meet Bubba
15:35 UTC Mark to LVEA to put away equipment near HAM3 from ion pump work
15:35 UTC APS through gate
16:00 - 16:09 UTC System lead meeting in CR
16:12 - 16:16 UTC Corey to LVEA to assess area around HAM6
16:24 UTC Peter to PSL enclosure
16:41 UTC Jeff B. to LVEA to remove dust monitors 4 and 5
17:01 UTC Jeff B. done
17:01 UTC Betsy to biergarten
17:11 UTC Travis to end X to get locking bracket and check health of suspension
17:28 UTC Filiberto and Daniel to PSL racks
17:33 UTC Travis back from end X, heading to LVEA to give part to Betsy
17:38 UTC Travis back
18:04 - 18:14  UTC Tour in CR
18:21 UTC Kingsoft water through gate, here to take samples
18:54 UTC Tour in control room
19:05 UTC APS through gate
19:15 UTC Peter back
19:37 UTC Betsy back
20:03 UTC Betsy and Filiberto to biergarten
20:07 UTC Bubba to mid and end stations to lubricate fans
20:18 - 20:24 UTC Keita turning on power to ISS second loop chassis
20:50 UTC Hugh to end X to check HEPI
20:57 UTC Greg to LVEA to replace TCS laser enclosure panels
21:01 UTC ITMY ISI being unlocked
21:05 UTC Filiberto to LVEA to talk to Greg
21:09 UTC Jeff K. running transfer function measurements on ITMY
21:10 UTC Hugh back
21:11 UTC Jason and Rick to PSL enclosure
21:24 UTC Filiberto to PSL racks, install EOM driver panel
21:25 UTC Tyler, Mark to LVEA to put door on ITMY BSC chamber
21:38 UTC Peter to PSL racks
21:55 UTC Travis to LVEA to help with closeout
21:59 UTC Betsy, Travis back
21:59 UTC Keita to PSL racks to check PSL ISS second loop board
22:42 - 22:56 UTC Tour in CR
22:48 UTC Tyler and Mark done, BSC1 and BSC3 doors are on
23:00 UTC Peter done
23:01 UTC Filiberto done
Displaying report 1-1 of 1.