UNTIL FURTHER NOTICE, DO NOT DRINK TAP WATER.
There are some elevated contaminate levels in the water, which are being addressed.
Please remember to close your completed work permits.
VAC:
Torqueing bolts on BSC 1 & BSC3
Starting the CS pump down
PSL:
Cheryl will be working on IO alignment and PD installation in the PSL enclosure
CDS:
Work on access control system continues. These is cabling pulling in the LVEA and installation work in the staging building.
SUS:
ETM-X installation and alignment work
SEI:
Hugh is swapping the CPS rack for ITM-X
MISC:
Dick G. continuing work on RF measurements
Tuesday Maintenance:
Several model restarts
Guardian updates
PSL ISS model work