Reports until 16:43, Monday 07 May 2018
H1 TCS (TCS)
greg.grabeel@LIGO.ORG - posted 16:43, Monday 07 May 2018 - last comment - 16:47, Monday 07 May 2018(41864)
TCS tables

The new panels were installed on the TCS CO2 tables along with the new light pipe clamps and flange. Unfortunately, this design leaves a small gap between the D1600112 jaw plate and the flange, as seen here:

.

I propose using metalized duct tape to seal the various gaps from the table. On CO2 X the T connectors had broken while trying to disconnect the tubing and was replaced. Also attached are photos of the IR sensor in place on the viewport, and the "strain-relief" connection on the laser power cable.

Images attached to this report
Comments related to this report
greg.grabeel@LIGO.ORG - 16:47, Monday 07 May 2018 (41873)TCS

Also, CO2 Y chiller was taken out of RS-232 serial communication mode so I could manually turn it on to purge the air and refill the lost water from disconnecting the tubing. It wouldn't allow itself to be turned on otherwise. It should be able to be switched back without any issues.