Ops Shift Log: 05/07/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked - Vent
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Chamber work at End-X. BSC1 & BSC3 door torqueing; Vacuum work at various locations; Commissioning and alignment at various locations. Pump down in LVEA has started – No table or viewport work until further notice.
Activity Log: Time - UTC (PT)
15:00 (08:00) Start of Shift
15:04 (08:04) Ken – Working in the LVEA between the High Bay roll up door and X-Arm termination slab
15:17 (08:17) Christina – Cleaning at End-X
16:26 (09:26) Karen – Going to clean at End-Y
16:27 (09:27) Hugh – Going to LVEA to swap ITM-X CPS rack
16:34 (09:34) Betsy & Travis – Going to End-X for Quad work
16:39 (09:39) Apollo crew & Chris – Going to torque bolts on BSC1 & BSC3
16:55 (09:55) Gerardo – Going to check vacuum stuff on HAM5/6
17:03 (10:03) Filiberto & Marc – Going to End-Y
17:18 (10:18) Greg – Working on TCS chillers
17:19 (10:19) Hugh – Is out of the LVEA
17:30 (10:30) Apollo Door crew & Chris – Out of the LVEA – Finished with door torqueing
17:41 (10:41) KingSoft Water – On site to service the RO system
18:30 (11:30) Filiberto & Marc – Back from End-YT
19:41 (12:41) Apollo – Working on RO system in Carpenter Shop
20:11 (13:11) Mark – To End-X for Quad installation
20:30 (13:30) Betsy & Travis – Going to End-X
20:34 (13:34) Sheryl – Going into the PSL enclosure for IO work
21:14 (14:14) Apollo – Finished in Carpenters Shop
21:34 (14:34) Richard – Going to CER
21:48 (14:48) Richard – Out of the CER
21:55 (14:55) Ken – Finished in LVEA for the day
22:26 (15:26) Mark – Back from End-X
23:00 (16:00) End of Shift