I installed the RGA electronics module on the RGA installed @ CP4 and energized its filament in preparation for a preliminary (above ambient temperature) scan tomorrow. I also asked Bubba to restore the VEA temperature setpoint to its pre-CP4 bake value. Following tomorrow's preliminary RGA scan, Ken D. will decouple the duct heaters and control panel while Mark D. and Tyler G. will remove the insulation skirt, aluminum foil wrap and added insulation from the blanketed enclosure.