TITLE: 05/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Started covering for Cheryl at 10amPDT.
LOG:
- Moving snorkel lift out of High Bay to MY (Mark & Tyler)
- 17:00 Finished EX HEPI Fluid work (Hugh)
- 17:00 EX Laser HAZARD for alignment of ETMy via PCal laser (Travis)
- 17:00-18:13 Beginning work for ETMy. Transitioned to SAFE at lunch. (Travis & Betsy)
- 17:00 Emer-Stop button (Fil)
- 17:11 Installing cable tray hardware (Ken)
- 17:40 Turned ON RF Modulators at the PSL Rack, and now the RFAM FOM looks better! (Daniel)
- 17:42 Work at the vault (Marc, Fil)
- TJ covering for me from 18:05-18:55
- 1814 Sheila transitioning LVEA to LazHaz
- 1827 Keita to EX to check the alignment with ALS. will be LazHaz
- 1833-19:00 Sheila and Jenne to IOT2L
- 1850 Georgia turning on HV at EY to start charge measurements
- 1853 Greg to LVEA to get numbers for TCS AOM
- 20:13 MY CP4 Oven disassembly work (Mark, Tyler, Chris, Ken)
- 21:21 Beam characterization work in Squeezer Enclosure, LVEA Laser HAZARD already, but they'll energize the signs in Squeezer Bay for this work (Thomas V, Dan B.)
- 21:30 Decouple Annulus ion pump plumbing from BSC1/3 (Gerardo)
- 22:12 Began receiving high pressure Verbal Alarm at BSC2.
- 22:40-22:59 IMC phasing work (Sheila, Craig)