Displaying report 1-1 of 1.
Reports until 17:15, Thursday 10 May 2018
LHO VE (VE)
gerardo.moreno@LIGO.ORG - posted 17:15, Thursday 10 May 2018 - last comment - 09:21, Friday 11 May 2018(41943)
Leak Test of IP gate valves, HAM2, HAM5 and BSC2 Viewports/blanks

(Kyle R, Gerardo M)

Today after lunch we removed all aux cart equipment used to pump down BSC1 and BSC3 annulus systems, then we moved to do a gross leak check of disturbed joint conflats, background for the entire procedure remained under 10-09 torr*L/sec.
Helium leak tested the viewports/blanks installed on HAM2 and HAM5, and the new installed ion pump gate valves (IP1 and IP2).  Kyle noted a couple of viewports that had tape indicating that needed testing on BSC2, leak checked those as well, and removed the tape.  No gross leaks found.

Comments related to this report
kyle.ryan@LIGO.ORG - 09:21, Friday 11 May 2018 (41948)

Note that we had valved-out the YBM MTP so that all of the helium signal would be routed through the Vertex MTP which was backed by the leak detector.  Each joint got a minimum of 120 seconds of audible helium flow, 60 seconds at each 180 degree-separated test slot.  Also, following this exercise, we re-exposed the YBM MTP and added the XBM MTP.  Thus, the combined volumes of the Vertex+YBM+XBM are now pumped by the (3) MTPs.