The Mid Y VEA temperatures are being controlled and are at 68degF, permitting us to power up the PEM system there. Jonathan and myself powered up the IO Chassis, the network fiber-converters and the frontend h1pemmy. Since this was an early RCG3.4/3.0.8 test prior to being powered down, I rebuilt both models against RCG3.2/2.6.34 and restarted them.
The latest CDS Overview MEDM once again shows the h1pemmy models. The EDCU has been "greened" by accepting the two missing h0vaclx channels.
It looks like the h0weathermy code sees the comtrol box at MY, but the Davis weather station is not accessible and may need a power cycle.