Reports until 10:48, Friday 14 September 2012
H1 SUS
jeffrey.bartlett@LIGO.ORG - posted 10:48, Friday 14 September 2012 (4201)
Reconnect Cables in Ham-3
   Filiberto, Andres, and Jeff reconnected the cables to the feedthrough Kyle repaired. MC2 has been reconnected to the test stand and connections were verified. Andres and Jeff made minor centering adjustments to the OSEMs. 

   MC2 is again ready for testing.