Displaying report 1-1 of 1.
Reports until 16:11, Wednesday 16 May 2018
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:11, Wednesday 16 May 2018 (42021)
Ops Day Shift Summary
Ops Shift Log: 05/16/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for upgrade vent
Intent Bit: Engineering
Support: X
Incoming Operator: N/A
Shift Summary: Close out and commissioning  
 
Activity Log: Time - UTC (PT)
14:45 (07:45) Peter – Transition to laser safe
14:50 (07:50) Apollo crew – Starting on HAM6 doors
15:00 (08:00) Start of shift
15:20 (08:20) Bubba – Going to Mid-Y to get trailer
15:27 (08:27) APS – On site for access controls work
15:34 (08:34) Hugh – Going into CER
15:38 (08:38) Filiberto – Modifying laser stop button in change room
15:44 (08:44) Hugh – Out of the CER
15:46 (08:46) Filiberto – Finished in change room
15:47 (08:47) Gerardo – Going to HAM6
15:58 (08:58) Marc & Hugh – Going to HAM2
16:31 (09:31) Gerardo – Out of the LVEA
16:35 (09:35) Hugh – Going into the LVEA
16:43 (09:43) Ed – In the LVEA working on the OpLevs
16:52 (09:52) Apollo crew – Removing doors at HAM6
17:00 (10:00) Hugh – Out of the LVEA
17:00 (10:00) Christina & Vanessa – Cleaning Mid-Y VEA
17:25 (10:25) Marc – Back from vault
17:44 (10:44) Gerardo – Going to HAM6
17:55 (10:55) Jason – Going into the LVEA to work on OpLevs
18:02 (11:02) Dave – Going to Mid-Y
18:22 (11:22) Peter – Transition LVEA to laser hazard
18:25 (11:25) TJ – Going to HAM6
18:34 (11:34) Apollo crew – Finished with HAM6 door removal
18:40 (11:40) Mark & Tyler – Going to Mid-Y to move fan off termination slab
18:41 (11:41) Daniel – Turning on Squeezer laser
18:41 (11:41) Jenni – Going to HAM6
18:49 (11:49) Daniel B. – Going to HAM6
19:37 (12:37) TVo – Going to Squeezer Bay
19:41 (12:41) TVo – Out of the LVEA
19:56 (12:56) Peter – Going into the H2 Enclosure to look for PZT driver
20:01 (13:01) Betsy – Going into the LVEA
20:05 (13:05) TVo – Going into the LVEA to look for TCS parts
20:22 (13:22) Peter – Out of the LVEA
20:23 (13:23) Gerardo – Going to End-Y to look at purge air equipment
20:30 (13:30) Jason & Ed – Centering BS OpLev
20:41 (13:41) Betsy – Out of the LVEA
20:41 (13:41) Jenni & Dan B – Out of the LVEA
20:42 (13:42) Robert – Going into the PSL enclosure
20:53 (13:53) Jason & Ed – Out of the LVEA
20:59 (13:59) Dave – Going to Mid-Y
21:21 (14:21) Mark & Tyler – Going into the LVEA for HAM6 south door
21:22 (14:22) Robert – Out of the PSL enclosure
21:22 (14:22) TJ – Out of the LVEA
21:30 (14:30) Peter – Transitioned LVEA to laser safe
21:36 (14:36) Seb, Salwek, Travis – Going to End-X
22:05 (15:05) Apollo crew – Finished with HAM6 door
22:14 (15:14) Dave – Back from Mid-Y
22:22 (15:22) APS – On site for access
22:59 (15:59) TVo, Dan, Alexie – Going to End-Y to take some table pictures – Will be laser hazard
23:00 (16:00) Peter – Transition LVEA to laser hazard
23:00 (16:00) End of shift  
Displaying report 1-1 of 1.