TITLE: 05/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
HAM6 is now sealed up & there are plans to pump on Monday.
LOG:
- 15:18 APS arriving on site to work at the LSB. (Richard notified)
- Investigating ground loop issues for HAM6's ZM1 (Fil, TJ)
- 16:54 MY VAC work (WP7572) [Chandra, Gerardo]
- 21:00 Returning to MY (Chandra)
- 17:10-17:49 Working at IOT2 (Robert)
- 17:49 Mid stations trip for PEM/Vault work (Marc)
- 17:49-1800 LVEA transitioning to SAFE (Peter)
- 18:00-19:00 HAM6 N. door install (Mark & Tyler)
- 18:17 Disconnecting ISCT6 fibers (Daniel)
- 19:09-19:34 Grabbing parts at EX (Travis)
- 19:49 Transitioning LVEA to Laser HAZARD (Corey)
- 20:06 Looking at SRM Heater Laser (DanB, JeffJ)
- 21:08-22:15 EX AMD break down/removal of equipment (Seb, Slawek, Travis)
- 21:08 IOT2 work (Robert)
- 22:14 Vault & MX work/trip (Fil, Marc)
- 22:28 EX in-chamber photos (Robert)