Displaying report 1-1 of 1.
Reports until 16:10, Friday 18 May 2018
H1 ISC (SYS)
sebastien.biscans@LIGO.ORG - posted 16:10, Friday 18 May 2018 - last comment - 17:48, Friday 18 May 2018(42080)
AMD installation at LHO DONE!

Sebastien, Slawek, Travis

We pulled out the remaining jigs from the ETMX chamber this afternoon. All the AMDs are still in place in their nominal locations, with what looks like homogeneous bond (Slawek will post pictures later). No issue to report.

This was the last chamber: all the test masses are now equipped with 4 AMDs. Big thanks to the team for the warm welcome and the help.

Comments related to this report
slawomir.gras@LIGO.ORG - 17:48, Friday 18 May 2018 (42081)
 
The suspension flats on the ETMx were free of scratches so we were able to install AMDs at their nominal position. The bond of each AMD looks smooth and is free of any abnormal features. Thus the bond thickness should not exceed the design 1e-6 m. Please refer to the attached pdfs for more details.

P.S. No more PI at LHO.
Non-image files attached to this comment
Displaying report 1-1 of 1.