Reports until 09:44, Monday 17 September 2012
H1 ISC
corey.gray@LIGO.ORG - posted 09:44, Monday 17 September 2012 (4214)
Tip Tilt Assy Work

(Suresh Doravari, David Jones mainly [& myself a little])

Suresh was onsite for the last two weeks to assemble as many Tip Tilts as he could (Suresh is from LLO, but we have all the hardware here).  Each interferometer requires a total of (6) Tip Tilts.  As of late Friday (9/14) afternoon, Suresh completed all Tip Tilts for LHO & LLO, and completed 2 (of 6) for India.  He wanted to finish all of them, but he was missing some hardware, so he completed the remaining Tip Tilts as much as he could.

We bagged and tagged all of these assemblies on Fri afternoon.  I'll be sending him the LLO batch.  The LHO batch and other assemblies will be stored in the Staging Bldg Optics Lab in the meantime.  Suresh will be back to finish building these assemblies.

Images attached to this report