H1 General
edmond.merilh@LIGO.ORG - posted 15:58, Wednesday 23 May 2018 (42140)
Shift Summary - Day

TITLE: 05/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

 

15:14 APS on site

15:29 HFD on site for hydrant testing

15:30 Marc and Hugh out to vault/LVEA

15:35 Jeff B out to LVEA to investigate TCS water leak

15:54 Richard out to LVEA

16:01 Jason out to LVEA to investigate TCSY leak

16:20 Jason back

16:23 Karen servicing Y arm

16:24 Dan and Marie out to Squeezer Bay

16:25 Peter out to PSL enclosure

16:30 Richard back

16:35 Chandra into LVEA to valve in RGA

16:37 Fil out to LVEA for HAM6 cabling

16:38 Mark and Tyler to EX to remove arm from BSC

16:50 Jason out to PSL enclosure

16:51 Dan, Marie and Alexie out to EY

17:00 Chandra back

17:15 Aiden out to EY

17:53 Marc and Hugh back and done

17:56 Jeff B back

18:00 Jason and Peter back

18:24 Jeff B out to transition the LVEA to LASER hazard

18:30 Cheryl and Jeff J out to PSL enclosure

18:43 Travis to Optics lab

18:50 Travis out

20:59 Aiden, Aiden, Marie, and Alexie out to EY

21:25 Cheryl back

22:02 Jeff B out to HAM6 to reset dust monitor and mechanical room to check on TCSY chiller

22:09 Kyle and Gerardo to MY

22:12 Jeff B back

22:24 Marc to MX

22:25 Amber in CR with tour

22:27 Chandra out to MY

22:57 Marc back