H1 ISC
daniel.sigg@LIGO.ORG - posted 12:40, Thursday 24 May 2018 - last comment - 15:18, Thursday 24 May 2018(42176)
ASAIR beam

Finished the alignment work with the ASAIR beam on ISCT6. The periscope had to be moved and the top mirror lowered. This allowed the beam to travel down periscope and hit the 2 steering mirrors on the table. Couldn't find a camera, so the beam is currently dumped.

Also installed the tube that connects the viewport adapter to ISCT6 and removed the Lexan protectors.

The feet of ISCT6 have been set down. The new table position still needs to be marked on the floor.

Comments related to this report
daniel.sigg@LIGO.ORG - 15:18, Thursday 24 May 2018 (42178)

Found a GigE camera (MAC: 00:30:53:22:94:A0) in the squeezer bay and mounted it in the ASAIR beam on ISCT6.

Reconnected the picomotors for HAM6.