Reports until 16:07, Friday 25 May 2018
H1 General
edmond.merilh@LIGO.ORG - posted 16:07, Friday 25 May 2018 (42185)
Shift Summary - Day

TITLE: 05/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

15:30 Jeff B out to LVEA to reset dust monitors

15:34 Jeff back

16:14 Alexei, Marie, TJ, and Dan out to EY

16:46 Aiden out to EY

16:57 Chandra out to LVEA

17:02 Chandra back

17:17 Travis out to EX

17:25 Marc heading out to the vault

17:35 Chandra out to MY

17:45 Travis back

17:47 Daniel out to Squeezer Bay

18:30 Gerardo to MX

18:36 crew back from EY

18:57 Gerardo back

19:00 Marc back

20:01 Peter amd Jeff out to LVEA to take photos

20:15 HWS crew out to EY

20:30 Gerardo to EY

21:19 Marc out to vault/MX

21:51 HWS crew back

22:07 Marc back

16:04 Marc back out to vault