Reports until 16:53, Friday 25 May 2018
daniel.sigg@LIGO.ORG -
posted 16:53, Friday 25 May 2018 (42195)
- Reconnected the OPO and CLF fibers at the table. The fiber extension patches are no longer needed now that ISCT6 is in its final location.
- Turned the squeezer laser on.
- Reconnected the PSL sample fiber. We seem to have about a factor of 5 less light coming through compared to before. The PSL reference cavity transmission is down by the same amount. So, its alignment needs some tweaking.
- Rediscovered that the fiber transmission PD (DC1) is actually after the polarizer. So, it is measuring the light towards the fiber PD and not the light out of the fiber.
- Removed the temporary laser controller from SQZT6. The laser on the table is next.
- The fibers going to SQZT6 are still curled up on top of HAM5 and need to be reconnected.