robert.lane@LIGO.ORG - posted 13:45, Friday 17 December 2010 (422)
SUS Progress
- Used Marc Barton probe to measure UIM with top mass and PEN mass fixed.
- Main Chain UIM mass blade tips lowered to 15mm setting.
- This induced pitch - so lateral adjustments were performed to reset 5mm spacing.
- Chain left completely free.