Travis, Betsy, Jim, Kissel
Today,
- Kissel tuned the BRDs for ETMX
- Travis and I installed the BRDs onto the main chain of the QUAD - the pointing of the main chain is still good
- Jim and Travis removed the ~6 large ISI masses on the +Y side of the table in order to shuffle them to new balance locations updated in the table layout drawing (to compensate for the EFM about to be installed)
- I opened the EFM and started looking at the "bracketry" for it's install - will do this install tomorrow morning with Georgia/Craig
- Jim and Kissel attempted to launch the B&K of the PCAL but found a big problem with the B&K driver unit... looks like it'll have to go out for repair.