Reports until 15:38, Monday 17 September 2012
H1 INS
jodi.fauver@LIGO.ORG - posted 15:38, Monday 17 September 2012 (4222)
BSC9 ICC
Hand brushing of the upper chamber was completed this morning. Half of the BSC flooring was stacked to expose half of the lower chamber: both pneumatic and hand brushing were completed on the exposed half. The flooring was replaced and the other half stacked to expose the other side of the lower chamber.