EOM PD restored:
- the Thorlabs PD that was originally installed on the EOM pick off path, has been restored to this location
- it was replaced by the ISS PD for a while, but the ISS PD is back in the ISS box
- this Thorlabs PD will be replaced with a large area PD
IO GigE camera 2 installed:
- IO_AB_M12 was swapped, the super polished mirror removed, and a 98% beam splitter installe
- at 7.6W incident on the bottom periscope mirror, there is 6uW on the camera
- since this camera is downstream of the rotation stage, it's SUM will vary as IMC INPUT power varies
- I've set the gain to 1850
- when the IMC IN power is 20W, the camera 2 gain will, in theory, produce a SUM of around 2.7e8, and closely match camera 1's SUM
- camera 1 incident power is 15uW, with the PMC transmitted power of 42.2W
- camera 2 incident power is 6uW, with 7.6W incident on the bottom periscope mirror
IMC power recalibrated:
- before any recalibration, measured the power before the bottom periscope mirror was 7.6W, with a requested power on the rotation stage of 6.9W
- Keita recalibrated the IMC IN PD
- his notes are attached, as a snapshot