Displaying report 1-1 of 1.
Reports until 17:15, Monday 17 September 2012
H1 SEI
hugh.radkins@LIGO.ORG - posted 17:15, Monday 17 September 2012 (4223)
Payload Installed HAM1 & Optical Table almost Level
ScottL & HughR

Payloaded HAM1 Optical Table per D1200524.  This is 310lbs which stays on in place plus 40lbs to substitute for the ISC equipment that will eventually go onto the Table.  I've got the Table level to ~+-0.15mm but the elevation is low by 15mm.  We'll continue to work this Tuesday.
Displaying report 1-1 of 1.