Ops Shift Log: 05/31/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for upgrades
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Chamber closeout, vacuum upgrades, PSL alignment, and general commissioning work in progress across the site.
Activity Log: Time - UTC (PT)
14:30 (07:30) Apollo crew – Craning ion pumps in the LVEA
14:54 (07:54) Karen – Cleaning in the LVEA
15:00 (08:00) Start of shift
15:30 (08:30) Apollo crew – Finished with ion pump move – Out of the LVEA
15:37 (08:37) Chandra – Hooking up pump cart to newly installed IP2
15:52 (08:52) Ken & Richard – Access controls system installation in the LVEA
15:56 (08:56) APS – On site for access controls install
16:04 (09:04) Richard – Out of the LVEA
16:14 (09:14) Marc & Ed – Going to Mid-X
16:17 (09:17) Richard – Going into LVEA to shutdown HAM6 cleanroom
16:22 (09:22) Gerardo – Going to HAM6
16:26 (09:26) Betsy & Travis – Going to End-X for closeout activities
17:09 (10:09) TVo – Going into CER to turn on ROC SR3 heater electronics
17:22 (10:22) Richard – Going to HAM6 area to work on camera install
17:37 (10:37) Marc & Ed – Back from Mid-X
17:45 (10:47) TVo & Dan – Cleaning up in the Squeezer bay
18:12 (11:12) Gerardo – Going to End-Y
18:27 (11:27) Keita – Going to End-Y to turn on ALS laser. End stations will remain laser safe
18:29 (11:29) Filiberto – Going to HAM6 for ground loop checks
18:30 (11:30) APS – On site for access controls install
18:35 (11:35) Dan & TVo – Out of the LVEA
18:55 (11:55) Jim – Back from End-X
18:58 (11:58) Keita – Back from End-Y
19:15 (12:15) Gerardo – Back from End-Y
20:10 (13:10) Cheryl – Taking students on LVEA tour
20:26 (13:26) Chandra – In the LVEA to leak check IP2
20:31 (13:31) Marc – Into the LVEA to label electrical chassis
20:40 (13:40) Apollo crew – Staging IP for install – Will be using the crane
21:06 (14:06) Peter – Going into the LVEA/PSL to check for source of high particle counts in PSL
21:06 (14:06) Apollo crew – Out of the LVEA
21:10 (14:10) Cheryl – Out of the LVEA
21:12 (14:12) Peter – Out of the LVEA
21:21 (14:21) Peter – Transition the LVEA to laser hazard
21:34 (14:34) Betsy & Travis – Going to End-X
21:44 (14:44) Sheila & Jenni – Going to the HAM6 area
22:04 (15:04) Georgia – Going into the LVEA
22:23 (15:23) Keita – Going into the LVEA to speak with Sheila & Jenni
23:00 (16:00) End of shift