Displaying report 1-1 of 1.
Reports until 16:34, Friday 01 June 2018
LHO VE
kyle.ryan@LIGO.ORG - posted 16:34, Friday 01 June 2018 (42296)
Shut off purge-air at X-end

Decoupled vent/purge line and shut down purge-air supply.  I then opened the 2 1/2" vent/purge valve and let the ~1 psig air "blow down" to slightly above room pressure.  The measured dew point of the exiting air was -10C. 

Displaying report 1-1 of 1.