E. Merilh, J. Oberling
We tweaked the beam alignment into the PMC this morning (done via picomotors from the control room). When we started the PMC was transmitting ~19 W, upon finishing the PMC was transmitting ~39.8 W. This is not quite at the 42 W we were transmitting after Peter and I installed the ISS AOM; this may be due to the temperature being ~10 °F hotter than normal, will monitor the PMC trans once PSL temps return to normal.
After the tweak we turned the ISS ON. The Reference Signal was set to -1.70V, which gives a 1.5% diffracted power percentage.