TITLE: 06/07 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
14:53 (7:53) Jeff B to LVEA H2 Chiller Room -- look for parts
15:00 (8:00) Start of shift
15:06 (8:06) Ken to EX, EY -- electrical work
15:40 (8:40) Jeff B back from LVEA
15:50 (8:50) Christina to EX, EY -- drop off first aid kits
16:50 (9:50) Jason to PSL enclosure -- investigate temperature spike
16:54 (9:54) Jeff B to EX -- recover contamination control kit
16:57 (9:57) Marc to MX -- testing vault magnetometer
17:03 (10:03) Hugh to EX -- check out HEPI pump
17:31 (10:31) Jeff B back from EX
17:31 (10:31) Jeff B to PSL -- make measurement
17:45 (10:45) Jason to LVEA
17:50 (10:50) Hugh back from EX
18:18 (11:18) Georgia and Craig to EX -- pack up EFM equipment
18:22 (11:22) Ed and Jason to EX -- pack up alignment equipment
18:33 (11:33) Marc back from MX
18:48 (11:48) Craig and Georgia back from EX
19:11 (12:11) Jeff B out of PSL enclosure
19:30 (12:30) Jason and Ed back from EX
19:41 (12:42) Jeff B and Jason to PSL enclosure -- make sure environmental controls are set right
19:50 (12:50) Jeff B and Jason back from PSL enclosure
20:28 (13:28) Fil to LVEA‌ -- Beckhoff upgrade preparation
20:35 (13:35) Gerardo to EX -- purge air skid
20:51 (13:51) Ken to EX -- work on overhead door switches
21:07 (14:07) TVo to LVEA -- Set up barriers around CO2 laser tables, open and start them, inject CO2 into chamber
21:12 (14:12) Marc and Ed to vault
21:40 (14:40) Ken back from EX
22:25 (15:25) Marc and Ed back from vault
22:59 (15:59) TVo back from LVEA
23:00 (16:00) End of shift