Shift Summary - Day

TITLE: 06/07 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC

STATE of H1: Planned Engineering

INCOMING OPERATOR: None

SHIFT SUMMARY:

14:53 (7:53) Jeff B to LVEA H2 Chiller Room -- look for parts

15:00 (8:00) Start of shift

15:06 (8:06) Ken to EX, EY -- electrical work

15:40 (8:40) Jeff B back from LVEA

15:50 (8:50) Christina to EX, EY -- drop off first aid kits

16:50 (9:50) Jason to PSL enclosure -- investigate temperature spike

16:54 (9:54) Jeff B to EX -- recover contamination control kit

16:57 (9:57) Marc to MX -- testing vault magnetometer

17:03 (10:03) Hugh to EX -- check out HEPI pump

17:31 (10:31) Jeff B back from EX

17:31 (10:31) Jeff B to PSL -- make measurement

17:45 (10:45) Jason to LVEA

17:50 (10:50) Hugh back from EX

18:18 (11:18) Georgia and Craig to EX -- pack up EFM equipment

18:22 (11:22) Ed and Jason to EX -- pack up alignment equipment

18:33 (11:33) Marc back from MX

18:48 (11:48) Craig and Georgia back from EX

19:11 (12:11) Jeff B out of PSL enclosure

19:30 (12:30) Jason and Ed back from EX

19:41 (12:42) Jeff B and Jason to PSL enclosure -- make sure environmental controls are set right

19:50 (12:50) Jeff B and Jason back from PSL enclosure

20:28 (13:28) Fil to LVEA‌ -- Beckhoff upgrade preparation

20:35 (13:35) Gerardo to EX -- purge air skid

20:51 (13:51) Ken to EX -- work on overhead door switches

21:07 (14:07) TVo to LVEA -- Set up barriers around CO2 laser tables, open and start them, inject CO2 into chamber

21:12 (14:12) Marc and Ed to vault

21:40 (14:40) Ken back from EX

22:25 (15:25) Marc and Ed back from vault

22:59 (15:59) TVo back from LVEA

23:00 (16:00) End of shift