yannick.lecoeuche@LIGO.ORG - posted 16:02, Friday 08 June 2018 (42409)
Shift Summary - Day

TITLE: 06/08 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC

STATE of H1: Planned Engineering

INCOMING OPERATOR: None

SHIFT SUMMARY:

15:00 (8:00) Start of shift

15:05 (8:05) Mark to LVEA -- collect rigging equipment

16:11 (9:11) Marc to EX -- grab timing comparator

16:21 (9:21) Robert to PSL

16:32 (9:32) Fil to LVEA

16:40 (9:40) Marc back from EX

16:48 (9:48) Kyle to EX VEA

18:51 (11:51) Robert to IOT2

19:02 (12:02) Georgia and TVo to LVEA -- look at IMC open loop transfer function

19:08 (12:08) Georgia and TVo back from LVEA

19:24 (12:24) Robert back from IOT2

20:01 (13:01) Mark and Tyler to EX -- mechanical work

20:10 (13:10) Kyle and guest to LVEA -- informal tour

20:32 (13:32) Jeff B to LVEA -- work on ITM cameras

20:34 (13:34) Georgia and Craig to LVEA -- look for router

20:37 (13:37) Ed and Marc to EX -- reinstall chassis

20:48 (13:48) Fil to LVEA

20:53 (13:53) Kyle, guest out of LVEA

20:57 (13:57) Ed and Marc back from EX

21:10 (14:10) Georgia and Craig back from LVEA

21:20 (14:20) Jeff B back from LVEA

21:30 (14:30) Kyle to LVEA -- open valve on pump cart

21:36 (14:36) Ed to LVEA -- look for wireless router

21:46 (14:46) Richard and Fil to LVEA -- look at temporary wiring

21:53 (14:53) Chandra to LVEA -- valve ion pumps

22:07 (15:07) Richard and Fil back from LVEA

22:08 (15:08) Kyle out of LVEA

22:08 (15:08) Kyle to EY

22:15 (15:15) Ed back from LVEA

22:40 (15:40) Chnadra back from LVEA

22:47 (15:47) Kyle back from EY

22:50 (15:50) Sheila and Hang to LVEA -- moving REFL9 phase shift from digital to analog

22:54 (15:54) Marc and Robert to vault

23:00 (16:00) End of shift