Per work permit 7644. I updated the PLC code on h0vaclx and h0vacly to add readbacks for the new annulus ion pumps on CP1 and CP2. I got messages when restarting h0vacly that seemed to indicate that at least one variable was forced, but I was unable to determine which. I thought at first it might be PT100, but a previous alog says it no longer was. I also got error messages when scanning the bus and decided to recreate the project and try again. I did not get error messages the next time. I think the only difference was that I activated the configuration before scanning on the second attempt. I burtrestored both h0vaclx and h0vacly to 6 AM local this morning. The in-vacuum high voltage will need to be turned back on. Dave will do a DAQ restart.
Power supplies for ESD ITMY/X, HAM6 Shutter, and HAM6 PZT were powered on on 6/12/2018 around 11:00 am.