(Mark D, Tyler G)
A new rack was installed at each end station. They were installed on one of the walls of the mechanical room for each station, on the north wall for the Y End, and the west wall for the X End. The racks are to consolidate vacuum controllers for NEGs and IPs.
Work per WP 7646.