TITLE: 06/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 12mph Gusts, 7mph 5min avg
Primary useism: 0.06 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY:
Daniel is working on IMC alignment.
Richard working on cameras.
APS on-site.
HAM6 ISI is tripped (looks like CPS issue---will check alog).