Reports until 08:18, Wednesday 13 June 2018
LHO General
corey.gray@LIGO.ORG - posted 08:18, Wednesday 13 June 2018 (42495)
Morning Status

TITLE: 06/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 12mph Gusts, 7mph 5min avg
    Primary useism: 0.06 μm/s
    Secondary useism: 0.10 μm/s
QUICK SUMMARY:

Daniel is working on IMC alignment.

Richard working on cameras.

APS on-site.

HAM6 ISI is tripped (looks like CPS issue---will check alog).