TITLE: 06/19 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
PSL has been down for most of the day, but...
PSL is on its way up currently (Jason & Peter currently working on it.)
Once beam is back, Commissioning Team will transition the LVEA back to Laser HAZARD tonight (WP#7661).
LOG:
(Continuing From 18:45utc after getting hand off from Ed)