Reports until 16:35, Thursday 20 September 2012
H2 SEI
hugh.radkins@LIGO.ORG - posted 16:35, Thursday 20 September 2012 (4259)
H2 SAT HEPI Temporary Tubing is 95% gone
EricA JimP Keith Filiberto & Hugh

We continued emptying the last of the fluid in the lines.  Eric disconnected the BSC8 chamber tubing from the 4-way valves and plugged the tubing.  Then he removed the Accumulators from the Manifolds.  Jim & Keith then took the tubing out from the BSC.  The supply mains were then pulled east and cut to extract them from the OMC area.  THere are a few hangers etc on the chamber but those will be pulled in the AM.
All the cable pulling is compete, CPS racks are removed as are the Dial Indicator trees.

Do we have to pull the Cable trays to put in the Walking Plates?  Do we need the Walking Plates?