Reports until 16:03, Friday 21 September 2012
H1 SEI
hugh.radkins@LIGO.ORG - posted 16:03, Friday 21 September 2012 (4271)
BSC2 BS ISI Assembly Status
JimW MitchellR & GregG

The crew got a portion of the Sensors installed on to the ISI.  These included the Trilliums and the Vertical L4-Cs & 1 Horizontal GS-13.  
Images attached to this report