hugh.radkins@LIGO.ORG - posted 16:07, Friday 21 September 2012 (4273)
LHO HEPI System Status
The final distributed piping on HAM4 was completed today. The distributed tubing from BSC8 has been reinstalled on BSC1. And a little more of the temporary tubing was removed.
The main supply & return lines are what remains.