See the attached photo of the SW corning of BSC1 where there is a temp reader of some sort. I must relocate this as it is where the HEPI plumbing runs. The Installation Manager said go ahead so I moved it to the other side of the viewports on the same flange still on the SW corner. If any one cares about how good a job I did of applying the proper amount of pressure etc of placing this, please give it a look over. However, if you try to look at data you likely won't see much as there is no cable connected to the satellite box downstream.