Reports until 16:00, Monday 09 July 2018
H1 AOS
jeffrey.bartlett@LIGO.ORG - posted 16:00, Monday 09 July 2018 - last comment - 16:30, Monday 09 July 2018(42823)
Ops Day Shift Summary
Ops Shift Log: 07/09/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked - Commissioning
Intent Bit: Commissioning
Support: N/A
Incoming Operator: N/A
Shift Summary: Commissioning work continues apace around the site.   
 
Activity Log: Time - UTC (PT)
15:00 (07:00) Start of shift
15:37 (08:37) S&K Electrical – Going to Both End stations for electrical work
16:25 (09:25) Corey – Transition LVEA to Laser Hazard
16:43 (09:43) Filiberto – Going to End-Y to move power supplies (WP #6052)
16:52 (09:52) TVo and Dan – Going to turn on both TCS- CO2 lasers
17:30 (10:30) TJ, TVo, Dan – End-X to install new HWS (WP #7695)
17:36 (10:36) Chris – Routine maintenance in both end station chiller yards
17:45 (10:45) TJ – Transition End-X to Laser Hazard
17:48 (10:48) Robert S. – Going into LVEA to look Squeezer Table
18:37 (11:37) Chris – Finished in chiller yard
18:59 (11:59) Craig – Going to the PSL rack to check on electronics
19:01 (12:01) TJ, TVo, Dan – Back for lunch
19:02 (12:02) Robert – Out of the LVEA for lunch
19:11 (12:11) Karen – Leaving End-Y
20:47 (13:47) TJ – Going into the Squeezer Bay and Optics Lab looking for fasteners
21:10 (14:10) Filiberto and Ken (S&K) – Going to End-X to install power receptacles (WP #7694)
21:15 (14:15) TJ & Dan – Going to End-X to work on HWS install (EP #7295)
21:21 (14:21) TVo & Stefan – Into the LVEA to re-center AS-Air camera
21:27 (14:27) Robert & Fellows – Going into the LVEA to mount accelerometers
21:29 (14:29) Gerardo – Going to End-Y to check on vacuum system
21:32 (14:32) TVo & Stefan – Out of the LVEA
22:46 (15:46) Robert – Out of the LVEA
23:00 (16:00) End of shift
Comments related to this report
gerardo.moreno@LIGO.ORG - 16:30, Monday 09 July 2018 (42824)

23:23 utc, S&K Electrical done with work at both end stations, X-End was last station visited.