Reports until 08:06, Thursday 12 July 2018
H1 General
edmond.merilh@LIGO.ORG - posted 08:06, Thursday 12 July 2018 (42868)
Shift Transition - Day

TITLE: 07/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 3mph Gusts, 1mph 5min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.10 μm/s
QUICK SUMMARY:

16:20 Peter out to the PSL - PMC and FSS are locked. The light pipe is open and there is light on the IMC REFL camera