TITLE: 07/17 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
- Maintenance Day! 15:00 - 20:05utc (8am - 1:05pm)
- There is a final tour w/ LVEA-entry happening later this evening (0:00utc) by JeffK.
- It's a hot one with temps above 100 now!
LOG:
- 13:10 (6:10amPDT) PSL Work begins (PeterK)
- 16:21 Jason joining
- 19:16 [DONE]
- 15:01 LVEA cleaning (Vanessa)[DONE]
- 15:04 ISI Config to SC_OFF_NOBRSXY---> need to transition back to WINDY later [DONE]
- 15:16 IPA teacher convoy enters. [DONE]
- 15:17 Running cable into PSL/Peter (Richard)[DONE]
- 15:34 L4C inventory work (Hugh)
- Completed LVEA....[DONE]
- 16:55-18:09 moving to both end stations
- Possibly H2 check?
- 18:18 [DONE]
- 15:35 Cycling green machine engine & then street sweeping Y-arm as far as temps permit (Mark) [DONE]
- 15:37 Dustmon pump check (Jeff)[DONE]
- 15:45-19:04 GS13 switch/glitch investigation (TJ) [DONE]
- 15:52 LN2 for EX ("tank #80") [DONE]
- 16:22 Checking CO2X alignment (danny, tvo)
- 23:10 TJ went to check up on them.
- 16:37 Swapping 71MHz Balun (dick, nolan, marc) [DONE]
- 16:45 Cintas onsite
- 16:59 LN2 for MX CP6[DONE]
- 17:09 ITMx oplev centering (Ed)[DONE]
- 17:23 Paradise onsite
- 17:55-18:25 Quad SUS model restart [+DAQ restart] (jeffk, dave) [DONE]
- 18:00-19:40 EX Pcal temp sensor check (fil, ed) [DONE]
- ~18:15 ETMx/y charge measurements (Corey) [DONE]
- 18:48 Going to CER for HAM GRD (Hugh) [DONE]
- 20:02-21:45 VAC work in EY & EX compressor room (Richard, Kyle, Contractor) [DONE]
- 20:05 UW tour (LVEA, roof, & split between end stations) [DONE]
- 20:17-21:11 Baluns checks (Dick & Nolan) [DONE]
- 20:38-21:50 troubleshooting fix to code for BRS (Michael Ross) [DONE]
- 21:43 Ed locked up Xarm in Green. :)
- 23:19 EX ALS PLL checks (Craig)
- End Shift Notes: Sheila headed down to EY earlier and is still down there. There will be a tour in the LVEA later tonight (see above)