Reports until 14:32, Tuesday 25 September 2012
H1 INS
jodi.fauver@LIGO.ORG - posted 14:32, Tuesday 25 September 2012 (4293)
BSC8 De-Install/BSC1 Install Prep
The Apollo crew stood down from ICC to work on BSC8 cartridge de-install staging. They positioned the leg-jacks near the appropriate legs and checked for orientation; installed four leg-jacks on the chamber cleanroom; located three BSC dome flats and two HAM ISI storage covers to use in place of BSC Dome Tall; retrieved the dome counterweight from X-end; and removed the dome.