Ops Shift Log: 07/18/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for commissioning
Intent Bit: Commissioning
Support: N/A
Incoming Operator: N/A
Shift Summary: PSL alignment and mode matching. Both arms are open for commissioning. LVEA is currently Laser Hazard.
Activity Log: Time - UTC (PT)
13:15 (06:15) Peter – Into the PSL Enclosure
14:59 (07:59) Peter – Out of the PSL
15:00 (08:00) Start of Shift
15:03 (08:03) Mark & Chris – Sweeping road along Y-Arm
15:45 (08:45) Richard – Going to Mid-Y to look at network switch
16:05 (09:05) APS – On site for access control work
16:25 (09:25) TJ, TVo, & Dan – Working on X-Arm HWS.
16:25 (09:25) Sheila – Going to ISC table at HAM1
16:47 (09:47) Hugh – Going into LVEA to get parts & equipment
17:05 (09:09) Hugh – Out of LVEA
17:10 (09:10) Sheila – Out of the LVEA
17:19 (10:19) Mark & Chris – Finished with sweeping along X-Arm
17:40 (10:40) Richard – Back from Mid-Y
18:04 (11:04) Chandra – Tanking measurements around H2 vertex
18:17 (11:17) Kyle – Going to End-X to shut off turbo pump
18:18 (11:18) Sheila & Hang – Going into LVEA
18:31 (11:31) Sheila & Hang – Out of the LVEA
18:44 (11:44) Chandra – Out of the LVEA
18:55 (11:55) TJ, TVo, Dan – Out of the LVEA
19:36 (12:36) APS – Working in LVEA near the H1 and H2 PSL enclosures
20:55 (13:55) Kyle – Going into the LVEA
21:12 (14:12) TJ, TVo, & Dan – Going to the X-Arm HWS table
21:25 (14:25) Kyle – Out of the LVEA
21:26 (14:26) Marc – Going to Mid-Y to get connectors
22:02 (15:02) Marc – Back from Mid-Y
22:42 (15:42) Marc – Going back to Mid-Y to look for more items
22:59 (15:59) TVo, TJ, Dan - Out of the LVEA
23:00 (16:00) End of Shift